Open: 0% | Closed: 100%
Final Report Released On: March 20, 2007
2005-4-I-TX-2
URGENT!
In light of the findings concerning the March 23rd incident at BP's Texas City refinery, revise your Recommended Practice 752, Management of Hazards Associated with Location of Process Plant Buildings or issue a new Recommended Practice to ensure the safe placement of occupied trailers and similar temporary structures away from hazardous areas of process plants. Ensure that the new recommended practice:
- Protects occupants from accident hazards such as heat, blast overpressure, and projectiles;
- Establishes minimum safe distances for trailers and similar temporary structures away from hazardous areas of process plants; and
- Evaluates the siting of trailers under a separate methodology from permanent structures, since trailers are more susceptible to damage, are more readily relocated, and likely do not need to be placed near hazardous areas.
Status:
Closed - Acceptable ActionThis link opens a new window
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
2005-4-I-TX-3
URGENT!
Issue a safety alert to your membership to take prompt action to ensure the safe placement of occupied trailers away from hazardous areas of process plants.
Status:
Closed - Acceptable ActionThis link opens a new window
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
2005-4-I-TX-4
Revise API Recommended Practice 521, Guide for Pressure Relieving and Depressurizing Systems to ensure that the guidelines:
- Identifies overfilling vessels as a potential hazard for evaluation in selecting and designing pressure relief and disposal systems;
- Addresses the need to adequately size disposal drums for credible worse-case liquid relief scenarios, based on accurate relief valve and disposal collection piping studies; and
- Warns against the use of atmospheric blowdown drums and stacks attached to collection piping systems that receive flammable discharges from multiple relief valves and urges the use of appropriate inherently safer alternatives such as a flare system
Status:
Closed - Acceptable ActionThis link opens a new window
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
Recommendations Status Change SummaryThis link opens a new window
2005-4-I-TX-6
Develop a new consensus American National Standards Institute (ANSI) standard that creates performance indicators for process safety in the refinery and petrochemical industries. Ensure that the standard identifies leading and lagging indicators for nationwide public reporting as well as indicators for use at individual facilities. Include methods for the development and use of the performance indicators. Ensure that:
a. the committees are accredited and conform to ANSI principles of openness, balance, due process, and consensus;
b. include representation of diverse sectors such as industry, labor, government, public interest and environmental organizations and experts from relevant scientific organizations and disciplines.
Status:
Closed - Acceptable Alternative ActionThis link opens a new window
Closed - Acceptable Alternative Action (C - AAA)
Recommendation Status Change SummaryThis link opens a new window
2005-4-I-TX-7
Develop a new consensus American National Standards Institute (ANSI) standard with fatigue prevention guidelines for the refining and petrochemical industries that, at a minimum, limit hours and days of work and address shift work. In the development of the standard, ensure that the committees:
a. are accredited and conform to ANSI principles of openness, balance, due process, and consensus;
b. include representation of diverse sectors such as industry, labor, government, public interest and environmental organizations and experts from relevant scientific organizations and disciplines.
Status:
Closed - Acceptable ActionThis link opens a new window
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
Recommendation Status ChangeThis link opens a new window