The CSB issues safety recommendations to prevent the recurrence or reduce the likelihood or consequences of similar incidents or hazards in the future. Recommendations are issued to a variety of parties, including government entities, safety organizations, trade unions, trade associations, corporations, emergency response organizations, educational institutions, and public interest groups. Recommendations are published in CSB reports and are closed only by vote of the Board. The CSB tracks all recommendations and communicates regularly with recommendations recipients to ensure that the recommended corrective actions are implemented.

For more information, see Frequently Asked Questions about CSB recommendations.


Quick Search

 
Recommendations Status:
 
 
Expand All

Recommendations

Yenkin-Majestic Resin Plant Vapor Cloud Explosion and Fire (7 Recommendations)
American Petroleum Institute (API) (1 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: November 30, 2023

2021-04-I-OH-6

Develop specific design, construction, and alteration guidance for low-pressure process vessels in flammable and other highly hazardous chemicals service not exceeding an internal pressure of 15 psig in API 510 Pressure Vessel Inspection Code, API RP 572 Inspection Practices for Pressure Vessels, and/or other appropriate products. At a minimum, include guidance for:

(i) determining and documenting the low-pressure vessel’s design pressure (such as through a data sheet and a nameplate affixed to the vessel);

(ii) determining when or if all or parts of the ASME Boiler and Pressure Vessel Code should be applied;

(iii) acceptable alternative engineering methods, if applicable; and,

(iv) alteration requirements, such as design assessments, inspections, and pressure testing.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

PDF Document Recommendation Status Change Summary

American Society of Mechanical Engineers (ASME) (1 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: November 30, 2023

2021-04-I-OH-7

Assist API in developing design, construction, and alteration guidance for low-pressure vessels in flammable and other highly hazardous chemicals service not exceeding an internal pressure of 15 psig. If any new design and construction guidance is specifically developed for pressure vessels in flammable and other highly hazardous chemicals service not exceeding an internal pressure of 15 psig, reference the design and construction guidance in the Section VIII, Division 1 of the ASME Boiler and Pressure Vessel Code (BPVC).


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

PDF Document Recommendation Status Change Summary

Yenkin-Majestic Paint Corporation (5 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: November 30, 2023

2021-04-I-OH-1

Update mechanical integrity procedures for all process vessels in highly hazardous chemicals service, including pressure vessels not exceeding 15 psig, to adopt alteration guidance in API 510 Pressure Vessel Inspection Code or Part 3 of the National Board Inspection Code.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

PDF Document Recommendation Status Change Summary

2021-04-I-OH-2

Assess and document applicable design, construction, and alteration standards for all pressure vessels in highly hazardous chemicals service in new resin plant designs, including pressure vessels not exceeding 15 psig. At a minimum, adopt PIP VESLP001 Low-Pressure, Welded Vessel Specification as design and construction guidance for pressure vessels not exceeding 15 psig. Implement a program to assess the pressure vessels against updated applicable recognized and generally accepted good engineering practices, such as those published by API, ASME, PIP, and other organizations, at least once every five years, and address the gaps identified. Develop and implement written procedures to document and maintain records of (i) all inspections of, (ii) all alterations to, and (iii) all maintenance and repairs on all pressure vessels in highly hazardous chemicals service.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

PDF Document Recommendation Status Change Summary

2021-04-I-OH-3

Demonstrate the use of prevention through design using the hierarchy of controls in future resin plant designs. Specifically, prioritize inherently safer design and engineering controls to prevent process safety events. Refer to sources such as Safety Instrumented Systems: A Life-Cycle Approach by P. Gruhn and S. Lucchini, Human Error in Process Plant Design and Operations – A Practitioner’s Guide by J. Robert Taylor, Guidelines for Preventing Human Error in Process Safety by the Center for Chemical Process Safety (CCPS), Guidelines for Inherently Safer Chemical Processes – A Life Cycle Approach by the CCPS, and Guidelines for Risk Based Process Safety by the CCPS for guidance. Demonstration could include documentation of conceptual design safety reviews, hazard analysis and risk assessments of detailed project designs, and a plan to address the recommendations to control the hazards.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

PDF Document Recommendation Status Change Summary

2021-04-I-OH-4

Identify and document all equipment that could release flammable materials and install LEL detectors in accordance with sources and guidance such as Guidelines for Engineering Design for Process Safety by the Center for Chemical Process Safety and Explosion Hazards in the Process Industries by Rolf K. Eckhoff. Ensure that detection of hazardous conditions automatically triggers both visual and audible alarms to alert plant personnel of the hazard. Develop and implement employee training on actions to take, such as prompt evacuation, when such alarms are activated.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

PDF Document Recommendation Status Change Summary

2021-04-I-OH-5

Develop and implement requirements for personnel to wear flame-resistant uniforms in all operating areas that process flammable chemicals. Update employee training material to include the requirement for and purpose of PPE use.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

PDF Document Recommendation Status Change Summary