The CSB issues safety recommendations to prevent the recurrence or reduce the likelihood or consequences of similar incidents or hazards in the future. Recommendations are issued to a variety of parties, including government entities, safety organizations, trade unions, trade associations, corporations, emergency response organizations, educational institutions, and public interest groups. Recommendations are published in CSB reports and are closed only by vote of the Board. The CSB tracks all recommendations and communicates regularly with recommendations recipients to ensure that the recommended corrective actions are implemented.

For more information, see Frequently Asked Questions about CSB recommendations.


Quick Search

 
Recommendations Status:
 
 
Expand All

Recommendations

Honeywell Chemical Incidents (29 Recommendations)
American Society for Nondestructive Testing (ASNT) (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: August 08, 2005

2003-13-I-LA-28

Communicate the findings and recommendations from the July 20 incident to your membership. Emphasize the need to evaluate test methods for appropriateness in the given equipment.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE) (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: August 08, 2005

2003-13-I-LA-22

Develop guidance on the effective design and maintenance of HVAC systems and other necessary control room components designed to protect employees and equipment in the event of a release of hazardous materials.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendation Status Change Summary

Baton Rouge Fire Department (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: August 08, 2005

2009-13-I-LA-23

Evaluate and update as necessary community notification procedures to include timely notification of residents in the event of a chemical release. Conduct periodic refresher training with staff on the requirements in the procedures.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

Chemical and Metal Industries (C&MI) (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: August 08, 2005

2003-13-I-LA-27

Develop formal procedures for disposition of nonconforming materials received from customers. Ensure that procedures include positive identification prior to shipment.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

East Baton Rouge Parish Office of Homeland Security and Emergency (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: August 08, 2005

2003-13-I-LA-24

Conduct an awareness campaign to educate residents on the proper response during a chemical release. Include instructions on the way residents (including those outside the affected area) can obtain information during an emergency.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

Honeywell Baton Rouge Facility (13 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: August 08, 2005

2003-13-I-LA-1

Revise inspection and testing procedures to include effective methods for detecting and preventing leaks in coolers that use chlorine. These procedures should include the use of appropriate NDT methods.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-2

Analyze layers of protection installed to prevent possible consequences of failure of heat exchangers that use chlorine, and implement corrective actions as appropriate. Examples of additional measures include installing monitors on the coolant stream to detect the presence of chlorine, and determining the feasibility of operating the coolant stream at a pressure high enough to prevent the entry of chlorine in the event of a leak.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-3

To address ongoing issues regarding layers of protection and leaks in heat exchangers, revise procedures for performing process hazard analyses for equipment that contains hazardous materials such as chlorine to, at a minimum: - Require an evaluation of the effects of leaks in heat exchangers.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

2003-13-I-LA-4

To address ongoing issues regarding layers of protection and leaks in heat exchangers, revise procedures for performing process hazard analyses for equipment that contains hazardous materials such as chlorine to, at a minimum: - Consider the layers of protection necessary to prevent a catastrophic incident and require recommendations to be implemented when existing protection is inadequate.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

2003-13-I-LA-5

Revise the incident investigation procedure to ensure that odors inside positive pressure control rooms are investigated, the causes identified, and the appropriate corrective actions implemented. Address causes of the releases as well as entry of the material into the building.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-6

Survey units that handle chlorine, and evaluate the effectiveness of shutdown systems for detecting and preventing the release of chlorine. At a minimum, ensure that shutdown systems and procedures are integrated to stop all potential sources of chlorine.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-7

Conduct training to emphasize that MOC evaluations must consider whether emergency shutdown procedures need to be changed when there are changes in material inventory.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-8

Conduct a hazard analysis (such as a job safety analysis) in the ton-cylinder area, incorporate appropriate findings into unit operating procedures, and train personnel accordingly.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-9

Revise plant procedures on receiving cylinders to require that weights be recorded on incoming materials and suspicious materials be isolated so that hazardous materials are handled appropriately.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-10

Revise the personal protective equipment matrix to include requirements for specific activities, such as draining HF equipment. Refer to the HFIPI guidelines as appropriate.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

2003-13-I-LA-11

Develop and implement a program for the identification and management of hazards in nonroutine situations. Ensure that this program covers the following: - Situations where employees are unable to follow standard operating procedures, such as properly purging equipment.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-12

Develop and implement a program for the identification and management of hazards in nonroutine situations. Ensure that this program covers the following: - Circumstances where there is no specific formal procedure for handling a highly hazardous chemical.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-13

Develop and implement a program for the identification and management of hazards in nonroutine situations. Ensure that this program covers the following: - Operations following an emergency shutdown.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

Honeywell International, Inc. (8 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: August 08, 2005

2003-13-I-LA-14

Develop and implement corporate standards to ensure positive pressure control rooms, including the HVAC systems, are designed and maintained to prevent the short-term entry of hazardous materials. Implement corporate standard changes at the Baton Rouge facility, and other Honeywell facilities as appropriate.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-15

Develop and implement procedures for positively identifying material rejected by contractors such as C&MI so that hazardous materials are handled appropriately.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

2003-13-I-LA-16

Develop and implement corporate standards for safely handling hydrogen fluoride.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

2003-13-I-LA-17

In light of the findings of this investigation report, conduct a comprehensive audit of fluorine-based manufacturing facilities in your Specialty Materials group facilities. Ensure that the audit addresses: Thoroughness of hazard analysis and adequacy of safeguards.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-18

In light of the findings of this investigation report, conduct a comprehensive audit of fluorine-based manufacturing facilities in your Specialty Materials group facilities. Ensure that the audit addresses: Recognition and management of nonroutine situations.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-19

In light of the findings of this investigation report, conduct a comprehensive audit of fluorine-based manufacturing facilities in your Specialty Materials group facilities. Ensure that the audit addresses: Adherence to standard operating procedures.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-20

In light of the findings of this investigation report, conduct a comprehensive audit of fluorine-based manufacturing facilities in your Specialty Materials group facilities. Implement the recommendations from the audit and communicate the findings to the work force.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-21

Communicate the findings and recommendations of this report to your employees at fluorine-based manufacturing facilities in your Specialty Materials group.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

Hydrogen Fluoride Industry Practices Institute (HFIPI) (2 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: August 08, 2005

2003-13-I-LA-25

Conduct a survey of members to determine best industry practices for HF handling activities, such as draining equipment, use of open systems, and nonroutine work. Develop best practices guidance as appropriate and communicate it to your members.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendation Status Change Summary

2003-13-I-LA-26

Communicate the findings and recommendations from the August 13 incident to your membership.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

International Brotherhood of Teamsters Local #5 (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: August 08, 2005

2003-13-I-LA-29

Work with Honeywell to communicate the findings and recommendations of this report to your members employed at the Honeywell Baton Rouge Facility.


Status: Closed - Unacceptable Action/No Response Received
Closed - Unacceptable Action/No Response Received (C - UA/NRR) - Recipient responds by expressing disagreement with the need outlined in the recommendation and the Board concludes that further correspondence on, or discussion of, the matter would not change the recipient?s position.
 

PDF Document Download