The CSB issues safety recommendations to prevent the recurrence or reduce the likelihood or consequences of similar incidents or hazards in the future. Recommendations are issued to a variety of parties, including government entities, safety organizations, trade unions, trade associations, corporations, emergency response organizations, educational institutions, and public interest groups. Recommendations are published in CSB reports and are closed only by vote of the Board. The CSB tracks all recommendations and communicates regularly with recommendations recipients to ensure that the recommended corrective actions are implemented.

For more information, see Frequently Asked Questions about CSB recommendations.


Quick Search

 
Recommendations Status:
 
 
Expand All

Recommendations

Valero McKee Refinery Propane Fire (12 Recommendations)
American Petroleum Institute (API) (4 Recommendations)
Open: 25% | Closed: 75%

Final Report Released On: July 09, 2008

2007-5-I-TX-1

Issue API-recommended practices for freeze protection in oil refinery process units that include, as a minimum: -the establishment of a written program; -periodic inspections to identify freeze hazards in dead-legs or infrequently used piping and equipment where water could collect; -specific approaches to eliminate or protect against such freeze hazards; and -identification of infrequently used piping or equipment subject to freezing as a trigger for Management Of Change (MOC) reviews.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

2007-5-I-TX-2

Revise API 2218, Fireproofing Practices in Petroleum and Petrochemical Processing Plants, so that conformance with the standard addresses jet fire scenarios, and requires more protective fireproofing radii and other measures (e.g., emergency isolation valves, depressuring systems) for pipe rack support steel near process units containing highly pressurized flammables.


Status: Closed - Acceptable Alternative Action
Closed - Acceptable Alternative Action (C - AAA)
 

PDF Document Recommendation Status Change Summary

2007-5-I-TX-3

Revise API Recommended Practice 2001, Fire Protection in Refineries, and API 2030, Application of Fixed Water Spray Systems for Fire Protection in the Petroleum Industry, so that conformance with these recommended practices includes the design, installation, and use of ROSOVs and interlocked equipment controls to enable the safe and rapid emergency isolation of process equipment containing highly pressurized flammables.


Status: Closed - Acceptable Alternative Action
Closed - Acceptable Alternative Action (C - AAA)
 

PDF Document Recommendations Status Change Summary

2007-5-I-TX-4

Revise API Standard 2510, Design and Construction of LPG Installations, and API Publication 2510A, Fire-Protection Considerations for the Design and Operation of Liquefied Petroleum Gas (LPG) Storage Facilities, to address effective deluge system activation during emergencies originating in nearby process units.


Status: Open - Acceptable Response or Alternate Response
Open - Acceptable Response or Alternate Response (O - ARAR) - Response from recipient indicates a planned action that would satisfy the objective of the recommendation when implemented.
 

United Steelworkers of America (USWA) (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: July 09, 2008

2007-5-I-TX-10

Work together to benchmark effective PHA methods and practices and implement improvements to the McKee Refinery PHA program, including: -involving the workforce in PHA preparation, performance, and follow-up; -training participants; -conducting PHA quality control checks; and -following up on recommendations for timely implementation and appropriate close-out.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

USW Local 13-487 (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: July 09, 2008

2007-5-I-TX-10

Work together to benchmark effective PHA methods and practices and implement improvements to the McKee Refinery PHA program, including: -involving the workforce in PHA preparation, performance, and follow-up; -training participants; -conducting PHA quality control checks; and -following up on recommendations for timely implementation and appropriate close-out.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

Valero Energy Corporation (5 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: July 09, 2008

2007-5-I-TX-5

Identify all processes in this and other refineries where Valero's mandatory Emergency Isolation Valve standard is applicable, and ensure that Remotely Operable Shut-off Valves (ROSOVs) are installed to control large accidental releases of flammable materials.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendation Status Change Summary

2007-5-I-TX-6

Establish corporate requirements for written freeze protection programs at Valero refineries subject to freezing temperatures, including identification, mitigation, MOC, and audit requirements.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendations Status Change Summary

2007-5-I-TX-7

Revise Valero standards, including Fire Proofing Specifications, to require evaluation of jet fire scenarios and, as a minimum, ensure more protective fireproofing for pipe rack support steel near process units containing highly pressurized flammables.


Status: Closed - Acceptable Alternative Action
Closed - Acceptable Alternative Action (C - AAA)
 

PDF Document Status Change Summary

2007-5-I-TX-8

Audit PHA performance at its refineries to ensure adherence to company standards and good practice guidelines.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

2007-5-I-TX-9

Implement Valero's strategic plan to replace chlorine used as a biocide in cooling water treatment with inherently safer materials, such as sodium hypochlorite, at all refineries.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

Valero McKee Refinery (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: July 09, 2008

2007-5-I-TX-10

Work together to benchmark effective PHA methods and practices and implement improvements to the McKee Refinery PHA program, including: -involving the workforce in PHA preparation, performance, and follow-up; -training participants; -conducting PHA quality control checks; and -following up on recommendations for timely implementation and appropriate close-out.


Status: Closed - Acceptable Action